H3c-technologies H3C SecPath M9000 Series Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Bezpieczeństwo H3c-technologies H3C SecPath M9000 Series. H3C Technologies H3C SecPath M9000 Series User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 0
H3C SecPath M9000 Multi Service
Security Gateway Series
Installation Guide
Hangzhou H3C Technologies Co., Ltd.
http://www.h3c.com
Document version:
A
PW102-20140307
Przeglądanie stron 0
1 2 3 4 5 6 ... 97 98

Podsumowanie treści

Strona 1 - Security Gateway Series

H3C SecPath M9000 Multi ServiceSecurity Gateway SeriesInstallation Guide Hangzhou H3C Technologies Co., Ltd. http://www.h3c.com

Strona 2

2 • Moving the chassis requires at least two people, and you can use a mechanical lift as needed. • Lift and put down the chassis slowly and never m

Strona 3 - Preface

3 Table 1 Temperature requirements Temperature Range Operating temperature 0°C to 45°C (32°F to 113°F) Storage temperature –40°C to +70°C (–40°F to

Strona 4 - Port numbering in examples

4 EMI Electromagnetic interference (EMI) might be coupled from the source to the gateway through the following coupling mechanisms: • Capacitive coup

Strona 5 - Documentation feedback

5 • Leave at least 10 cm (3.94 in) of clearance at the inlet and outlet air vents. Figure 1 shows the airflow through the M9010 chassis. Figure 2 sho

Strona 6 - Contents

6 Space For easy maintenance, follow these guidelines: • The equipment room is at least 3 m (9.84 ft) high. • Reserve at least 1 m (3.28 ft) of clea

Strona 7

7 Installing the gateway IMPORTANT: Keep the packages of the gateway and the components secure for repackaging. Confirming installation preparatio

Strona 8

8 1. Read the signs on the slide rails (see Table 6) to identify the left and right slide rails. Figure 3 Right slide rail (1) Guide rail (2) Sign

Strona 9 - Preparing for installation

9 Figure 4 Locating the cage nut installation positions on the rack post (1) Middle of the narrower metal area between holes 3. Install six cage n

Strona 10 - Temperature

10 6. Repeat steps 4 and 5 to install the other slide rail. Make sure the two slide rails are at the same height so that the gateway can be placed o

Strona 11 - Cleanness

11 • The M9010 gateway has two cable management brackets—the signal cable management brackets are installed at the upper part of the gateway, and th

Strona 12 - Cooling

Copyright © 2013-2014, Hangzhou H3C Technologies Co., Ltd. and its licensors All rights reserved No part of this manual may be reproduced or transmi

Strona 13

12 Figure 9 Attaching cable management brackets to an M9006 gateway (1) Place the cable management bracket against the installation position on the

Strona 14 - Tools and equipment

13 Attaching air filters to an M9006/M9014 gateway Air filters of an M9006/M9014 gateway are installed at the left of the chassis. The air filter ins

Strona 15 - Installing the gateway

14 Figure 12 Attaching an air filter to an M9010 gateway TIP: • Install power cable management brackets before you install an air filter to the g

Strona 16

15 Figure 13 Placing the chassis on the rack (M9006) 4. Use the screws to attach the mounting brackets to the rack. Figure 14 Securing the chassis

Strona 17

16 1. Remove the grounding screws from the grounding holes at the rear of the chassis. 2. Use the grounding screws to attach the two-hole grounding

Strona 18 - Installing cage nuts

17 Figure 16 Attaching an ESD wrist strap (M9006) Installing MPUs/LPUs/service modules/switching fabric modules IMPORTANT: • The gateway comes w

Strona 19

18 Figure 17 Installing a card Installing a power module CAUTION: • Do not install AC power modules and DC power modules on the same gateway. •

Strona 20 - Installing mounting brackets

19 Figure 18 Installing a power module in a vertical slot (M9010/M9014) Figure 19 Installing a power module in a horizontal slot (M9006) Installi

Strona 21

20 { For an SFP+ module, press the module down against the upward force of the bottom spring tab so you can push the module straight into the port.

Strona 22

21 Figure 21 Installing a CFP module (1) Gently push the CFP module into the slot (2) Fasten the captive screws on the CFP module 4. Connect the o

Strona 23 - Grounding the gateway

Preface The H3C SecPath M9000 Multi Service Security Gateway Series Installation Guide guides you through the installation of your gateway, including

Strona 24 - Installing FRUs

22 2. Plug one end of the optical fiber into the transceiver module on the gateway, and plug the other end into the transceiver module in the peer d

Strona 25

23 Connecting power cables WARNING! Before you connect the power cable to a power module, make sure the circuit breaker is switched off. Connectin

Strona 26 - Installing a power module

24 4. Connect the other end of the power cable to the power source. { Connect the blue DC power cable marked with –48V to the negative terminal (–4

Strona 27

25 Logging in to the gateway and configuring basic settings The first time you access a gateway you must log in through the console port. After login

Strona 28 - Installing a CFP module

26 Figure 25 Connecting a console port to a terminal (M9006) (1) Console port (2) Console cable (3) Console terminal Setting terminal parameters

Strona 29 - Connecting networking cables

27 Figure 26 Connection description 3. Select the serial port to be used from the Connect using list, and click OK. Figure 27 Setting the serial p

Strona 30

28 Figure 28 Setting the serial port parameters 5. Select File > Properties in the HyperTerminal window. Figure 29 HyperTerminal window 6. O

Strona 31 - Connecting power cables

29 Figure 30 Setting terminal emulation in Gateway Properties dialog box Powering on the gateway Before power-on Before powering on the gateway, co

Strona 32

30 • After the POST, the system prompts you to press Enter. When the command line prompt appears, the gateway is ready to configure. Logging in usin

Strona 33

31 Step Command Remarks Associate an ACL with the NAT address group on the interface: • No-PAT nat outbound [ acl-number ] address-group group-numbe

Strona 34 - Setting terminal parameters

Convention Description # A line that starts with a pound (#) sign is comments. GUI conventions Convention Description Boldface Window names, button

Strona 35

32 NOTE: For more information about these commands, see the command references that come with your gateway.

Strona 36

33 Troubleshooting This chapter describes how to troubleshoot your gateway. TIP: Clean your gateway periodically because the noncompliant operating

Strona 37 - Powering on the gateway

34 Garbled terminal display If terminal display is garbled, verify that the following settings are configured for the terminal, for example, HyperTer

Strona 38 - Logging in using Telnet

35 7. Plug a new power module of the same model into the same slot, and connect it to the same power input end. If the new power module can operate

Strona 39

36 If a card is operating correctly, the RUN LED flashes and the ALM LED is off. When the RUN LED is off, the card fails. To troubleshoot the card: 1

Strona 40 - NOTE:

37 8. If the problem persists, contact H3C Support. NOTE: • A combo interface is a logical interface that comprises one fiber port and one coppe

Strona 41 - Troubleshooting

38 Replacing FRUs CAUTION: • When replacing FRUs while the gateway is running, be aware of electrical safety hazards. • Strictly follow the repla

Strona 42 - Power supply system failure

39 { DC power cable—Remove the cable ties from the power cable, loosen the fastening screw on the power cable, and remove the power cable plug from

Strona 43 - MPU failure

40 To replace a card: 1. Prepare an antistatic mat to place the removed card. 2. If the card is an MPU, LPU, or service module, remove all its cabl

Strona 44 - Interface failure

41 Replacing a fan tray CAUTION: To avoid bodily injury, do not touch the rotating fans when replacing the fan tray. When the fan tray fails, repl

Strona 45

About the H3C SecPath M9000 documentation set The H3C SecPath M9000 documentation set includes: Category Documents Purposes Hardware specifications a

Strona 46 - Replacing FRUs

42 Figure 36 Removing a fan tray (1) Loosen the captive screws on the fan tray (2) Take the fan tray out of the chassis Installing a fan tray 1. U

Strona 47 - Replacing a card

43 The air filter removal and installation procedures for all M9000 gateways are the same. This section takes removing and installing an air filter o

Strona 48 - (3) Take out the card

44 For a QSFP+ module that uses a plastic pull latch, skip this step. QSFP+ modules use either a metal or plastic pull latch. 3. Grasp the clasp on

Strona 49 - Replacing a fan tray

45 Appendix A Chassis views and technical specifications Chassis views Every M9000 gateway has an MPU section, LPU section, service module section, s

Strona 50 - Replacing an air filter

46 Table 7 Chassis structure Section Description Remarks (1) LPU and service module slots N/A The chassis comes with no LPUs and service modules inst

Strona 51

47 NOTE: • Rack height is measured in RUs. One RU is 44.45 mm (1.75 in). • The dimensions listed in Table 8 are for gateway chassis, excluding m

Strona 52 - Replacing a CFP module

48 Module power consumption and system power consumption Card power consumption The power consumption of the cards depends on the card model and stat

Strona 53 - Chassis views

49 Table 13 Fan tray power consumption Model Minimum fan tray power consumption Maximum fan tray power consumption M9006 12 W 240 W M9010 13 W 32

Strona 54 - Weights and dimensions

50 Noise The gateway uses fans with the automatic speed adjustment function, so the sound pressure levels are different when the fan speeds are diffe

Strona 55

51 Appendix B FRUs and compatibility matrixes MPUs MPU is the core of the control management plane for the M9000 gateway series. The MPU model availa

Strona 56 - Fan tray power consumption

i Contents Preparing for installation ················································································································

Strona 57 - Environmental specifications

52 Table 18 LPU specifications LPU model Description Connector Number of interfaces Interface transmission rate Available transceiver modules NSQ1T

Strona 58 - M9014 66 dBA 79 dBA

53 For more information about the LPUs, see the card manuals that come with the LPUs. For more information about transceiver modules available for th

Strona 59 - Service modules

54 Item LSUM1AC2500 specifications LSUM1DC2400 specifications Temperature requirements Operating temperature: –10°C to +50°C (14°F to 122°F) Operatin

Strona 60

55 The M9000 security gateway air filters include the M9006 air filter, the M9010 air filter, the M9014 air filter. Order air filters compatible with

Strona 61 - Power modules

56 10-Gigabit XFP module Central wavelength Connector Cable specifications Modal bandwidth Maximum transmission distance XFP-LX-SM1542.94 1542.94 nm

Strona 62 - Air filters

57 Table 24 SFP+ cable specifications 10-Gigabit SFP+ cable Cable length Description LSWM2STK 1.2 m (3.94 ft) Used for connecting SFP+ ports LSWM3S

Strona 63 - Transceiver modules

58 Gigabit SFP module Central wavelength Connector Cable specifications Modal bandwidth Maximum transmission distance SFP-GE-LX-SM1310-BIDI TX: 1310

Strona 64

59 100-Mbps SFP module Central wavelength Connector Cable specifications Maximum transmission distance SFP-FE-LX-SM1310-A 1310 nm LC 9/125 μm single

Strona 65

60 Table 30 100-Gigabit CFP module specifications 100-Gigabit CFP module Central wavelength Connector Cable specifications Maximum transmission dista

Strona 66

61 Table 32 16A AC power cables used in different countries or regions 1 Connector type Code (Length) Countries or regions where the type of power ca

Strona 67

ii Logging in using Telnet ···························································································································

Strona 68 - AC power cable

62 4 Connector type Code (Length) Countries or regions where the type of power cables conforms to local safety regulations and can be used legally

Strona 69

63 Connector outline Power cable outline Connector outline 7 Connector type Code (Length) Countries or regions where the type of power cables con

Strona 70

64 Appendix C LEDs The M9000 gateway series provides a lot of LEDs. You can determine the gateway operating status by examining the LEDs. MPU LEDs Fi

Strona 71

65 Card LEDs Each MPU has the LEDs numbered the same as card slots to indicate the status of the active MPU, standby MPU, LPUs, service modules, and

Strona 72 - Appendix C LEDs

66 LED Color Description RUN Off Power is not being supplied to the card or the card is faulty. Steady green The card is operating incorrectly. Sl

Strona 73 - Service module LEDs

67 LED status Description Flashing green The SFP+ port is receiving or sending data at 10 Gbps. Steady yellow A 100/1000 Mbps link is present. St

Strona 74 - LPU LEDs

68 Table 44 Switching fabric module LED description RUN LED ALM LED Description Flashing Off The switching fabric module is operating correctly.

Strona 75 - Switching fabric module LEDs

69 LED Color Description DC Green The power module is outputting power normally. Red The power module is experiencing an output problem, including o

Strona 76 - Power module LEDs

70 Appendix D Cables This chapter describes cables used for connecting network ports. Table 48 Cable description Cable Port type Application Console

Strona 77

71 RJ-45 connector An Ethernet twisted pair cable connects network devices through the RJ-45 connectors at the two ends. Figure 41 shows the pinouts

Strona 78 - Appendix D Cables

iii Power module LEDs ································································································································

Strona 79 - Cable type

72 Based on pinouts Ethernet twisted pair cables can be classified into straight through and crossover cables based on their pinouts. • Straight-thr

Strona 80 - Based on pinouts

73 Pin assignments Select an Ethernet twisted pair cable according to the RJ-45 Ethernet interface type on your device. An RJ-45 Ethernet interface c

Strona 81 - Pin assignments

74 2. Strip off an appropriate length of the cable sheath. The length is typically that of the RJ-45 connector. 3. Untwist the pairs so that they c

Strona 82 - Optical fiber

75 Patch cord A fiber that has connectors at both ends is called a patch cord. A patch cord connects one optical device to another for signal routing

Strona 83 - Fiber connector

76 Precautions • Make sure the fiber connector and fiber type match the transceiver module type. • The fiber ports on some cards have shielded cove

Strona 84 - SFP+ cable

77 QSFP+ cable You can use QSFP+ cables to connect the QSFP+ ports. Figure 47 QSFP+ cable (1) Connector (2) Pull latch QSFP+ to SFP+ cable A QSFP+

Strona 85 - QSFP+ to SFP+ cable

78 Appendix E Cabling recommendations When an M9000 gateway is mounted in a 19-inch standard rack, the interface cables are routed through the cable

Strona 86 - Cable management guidelines

79 Figure 49 Correct and incorrect cable binding • The cable bend radius at connectors must be at least 5 times the cable diameter, and must be at

Strona 87

80 Figure 51 Binding cables where they must be bent • Route, bind, and attach excess cables for easy, safe maintenance activities and correct oper

Strona 88

81 Table 53 Tie-binding parameters Cable bundle diameter (mm) Space between bundles (mm) 10 80 to 150 10 to 30 150 to 200 30 200 to 300 • Do not

Strona 89 - 30 200 to 300

1 Preparing for installation The H3C SecPath M9000 Multi Service Security Gateway Series includes these models: • M9006 • M9010 • M9014 Safety To a

Strona 90 - Removing the grounding cable

82 Appendix F Repackaging the gateway This chapter describes how to repackage the gateway chassis, power module, card, mounting bracket, cable manage

Strona 91 - Repackaging the power module

83 Figure 53 Removing the grounding cable Removing the twisted pair and optical fiber You must remove twisted pairs and optical fibers from all the

Strona 92 - Repackaging the card

84 Repackaging the card 1. Prepare the anti-static bag and box of the card. Make sure the bag is clean, dry, and not damaged. 2. Remove the transc

Strona 93 - Removing the air filter

85 Figure 54 Removing the chassis (M9006) from the rack 5. Put the chassis onto the pallet base of the wooden carton. Removing the air filter 1.

Strona 94

86 Figure 55 Removing the mounting brackets from the chassis (M9006) 3. Put the mounting brackets into the box. Removing the cable management bra

Strona 95

87 Figure 56 Removing the cable management brackets (M9010) (1) Loosen the screws that attach the cable management brackets to the chassis (2) Remov

Strona 96

88 Figure 57 Installing the screws (M9010) 3. Cover the chassis with the packing bag, and then tape the bag to the base pallet. 4. Install the s

Strona 97

89 Index A C D E F G H I L M N O P Q R S T W A AC power cable,60 Air filters,54 Attaching cable management brackets and mounting brackets to the rac

Strona 98

90 S Safety,1 Service module LEDs,65 Service modules,51 SFP+ cable,76 Switching fabric module LEDs,67 Switching fabric modules,53 T Tools and equipm

Komentarze do niniejszej Instrukcji

Brak uwag